Organization
Organization Name: Suzhou eFastServ Technology Co., Ltd.
Organizational Unit: Technology Implementation Department
Appraisal Sponsor Name: yafeng sheng
Lead Appraiser Name: Alexander Kondakov
Partner Name: Guangzhou Tongbang Information Technology

Organizational Unit Description
Basic Units / Support Functions:
MES Phase II
    Suzhou, Jiangsu China
    Shanghai, China
**Sensitive**
    Shanghai, China
    Suzhou, Jiangsu China
**Sensitive**
    Shanghai, China
    Suzhou, Jiangsu China
Component Size Approval System
    Suzhou, Jiangsu China
    Shanghai, China
**Sensitive**
    Suzhou, Jiangsu China
    Shagnhai, China
**Sensitive**
    Shanghai, China
    Suzhou, Jiangsu China

Organizational Sample Size
% of people included: 25
% of projects/units included: 25
Org Scope Description: Two projects selected for inclusion are typical projects in this unit. These projects with four support groups represent the current processes, which can be mapped to practices of Maturity Level 3.

Appraisal Description
Last Day of Appraisal Onsite: Sep 12, 2019
Appraisal Expiration Date: Sep 12, 2022
Appraisal Method Used: SCAMPI V1.3 A
Model Information: CMMI-DEV v1.3
Sampling Summary
Sampling Factors: Location (Not Relevant: Projects of organizational unit involve several offices, however, methods and processes used in projects are the same. Thus, location can't be considered as significant factor.)

Customer (Not Relevant: This organizational unit includes projects dedicated to development of products according to customers’ requests, but in context of used processes all projects are not dependent on customer. Thus, this factor has no influence on projects.)

Size (Not Relevant: There are no significant differences in size of projects. So, no need to consider this attribute as significant sampling factor.)

Organizational Structure (Not Relevant: Approaches using in organizational unit's projects are following from organizational set of processes and based on organizational regulations on structure and composition. Thus, this factor is excluded from consideration.)

Type of Work (Not Relevant: Projects of organizational unit represent the one type of work – development with maintenance activities. Thus, this factor is not considered as significant for sampling.)

All basic units: All basic units for this appraisal (factor was added to support one subgroup usage in SAS).

Sampling Factor Values: All basic units (All basic units): Specific of basic units included in scope

No basic units (All basic units): Value to exclude units out of scope.

Subgroups:
All basic units: All projects included in scope of appraisal.
51 People, 8 Basic Units
- All basic units

Model Scope and Appraisal Ratings
CMMI-DEV v1.3
Level 2 Level 3 Level 4 Level 5
REQM
PP
PMC
SAM
MA
PPQA
CM
RD
TS
PI
VER
VAL
OPF
OPD
OT
IPM
RSKM
DAR
OPP
QPM
OPM
CAR
Maturity Level:Maturity Level 3